.
Pharmaceutical analyses and technologies
| No. | Analytical services | Planned execution time | Minimum price, EUR |
|---|---|---|---|
| 1 | Qualitative and quantitative analysis (potentiometric and KF titration, sulphated ash, etc.) | 2–3 days | 100 |
| 2 | Impurity analysis in drug substances and raw materials (HPLC-UV/RI/FLD) | 2–4 days | 300 |
| 3 | Impurity analysis in drug substances and raw materials (HPLC-MS/MS) | 2–5 days | 500 |
| 4 | Solvent residues in drug substances (GC-FID, GC-HS/FID) | 2–4 days | 200 |
| 5 | Trace metal analysis (ICP-MS/MS) | 2–4 days | 300 |
| 6 | Morfological analysis of API's and excipients (microscopy, particle size distribution) | 2–3 days | 200 |
| 7 | Dissolution testing (dissolution system, HPLC-UV/RI/FLD) | 2–5 days | 400 |
| 8 | Analytical method development (HPLC-UV/RI/FLD, HPLC-MS/MS, GC-FID, GC-HS/FID, ICP-MS/MS) | 1–2 weeks | 2000 |
| 9 | Forced degradation study (acids, basic, oxidative, temperature, temperature/humidity, photostability) | 2–4 weeks | 1500 |
| 10 | Method validation (depends on the method) (HPLC-UV/RI/FLD, HPLC-MS/MS, GC-FID, GC-HS/FID, ICP-MS/MS) | 2–4 weeks | 8000 |
| 11 | Compatibility testing (HPLC-UV/RI/FLD, HPLC-MS/MS, DSC, pXRD, FTIR) | 1–2 weeks | 1500 |
| 12 | Pre-stability study (1 batch) | 6–12 months | 10000 |
| 13 | Rheological analysis | 2–4 days | 300 |
| Technological services (analytical chemistry services not included) | |||
| 14 | Micronization of substances | 1–2 days | 500 |
| 15 | Tableting | 2–4 days | 500 |
| 16 | Capsuling in hard capsules (HPMC) | 2–4 days | 500 |
| 17 | Roller compaction | 2–4 days | 500 |
| 18 | Wet granulation | 2–3 days | 500 |
| 19 | Hot-melt extrusion | 2–4 days | 500 |
| 20 | Film coating | 2–3 days | 500 |
| 21 | Planning of development of dosage form (literature review, design of experiments) | 1 month | 5000 |
| 22 | Preparation of batch (1 batch, equipment + 2 specialists involved) | 4 days | 3000 |
| 23 | Preparation of 25 batches (equipment + 2 specialists involved) | 6 months | 80000 |
| 24 | Summary, preparation of the report | 1 month | 5000 |
| 25 | TOTAL: planning + preparation of 25 batches + summary and report | 7 months | 90000 |
| 26 | TECHNOLOGIES with complex analytics | 12 months | 30000 |
Laboratory of Finished Dosage Forms
21 Konsula iela, Rīga
E-mail: ff.info [at] rsu.lv
